软土地层盾构隧道工程风险管理方法研究(3)

作者:高永琪 董子博 张文 更新时间:2015-09-06 16:29 点击:
【论文发表关健词】盾构掘进 隧道工程 三图四表 动态管控 关键参数
【职称论文摘要】
Gao Yong-qi1,Dong Zi-bo2,Lu Zheng-yu 3,Zhang Wen-cui3, (1. Urban Rail Transit Engineering Co., Ltd. of China Railway First Group Co., Ltd., Xian 710054, China; 2.Ningbo Rail Transit Group C


  Gao Yong-qi1,Dong Zi-bo2,Lu Zheng-yu 3,Zhang Wen-cui3,
  (1. Urban Rail Transit Engineering Co., Ltd. of China Railway First Group Co., Ltd., Xi’an 710054, China; 2.Ningbo Rail Transit Group Co., Ltd.,Ningbo 315010, China;3. School of Civil Engineering, Xi’an University of Architecture and Technology,Xi’an 710055, China)
  [Abstract] According to the features of shield tunneling construction technologies and management, and based on the execution of the tunneling works of Package TJ2102 of Ningbo Metro Line 2 Phase I, the Paper studies the problems of the easily uplifting precast segment and the naughty TBM postures during the shield tunneling works through soft soil strata, studies and concludes the approaches of the dynamic risk management based on the reference of “ 3 Drawings and 4 Tables ”, defines the obligations of all the parties concerned in the constructions, analyzes the key parameters for the shield tunneling works, and establishes the management systems severally for each party based on the process control of the key parameters, which helps realize the meticulous management in the shield tunneling works, and can be taken as references for similar shield tunneling works through soft soil strata.
  [Key words] Shield tunneling works, tunneling works, 3 Drawings and 4 Tables, dynamic management, key parameter, etc.

(责任编辑:论文发表网)转贴于八度论文发表网: http://www.8dulw.com(论文网__代写代发论文_论文发表_毕业论文_免费论文范文网_论文格式_广东论文网_广州论文网)
发表评论
本站模板均经测试成功,请放心下载,遇到任何问题或者需要购买付费论文请联系本站。
表情:
验证码:点击我更换图片